MSBA Submissions

Balmer Elementary School Feasibility Study

Preliminary Design Program (PDP) - October 6, 2017

Preferred Schematic Report (PSR) - January 3, 2018

Schematic Design Report (SD) - May 9, 2018

Design Development Report (DD) - April 5, 2019

60% Construction Documents Submission - May 17, 2019

90% Construction Documents Submission - September 4, 2019

Please Note: The above files contained within this page range from 20MB to over 300MB in size.
Depending on the size of each document and the speed of your internet connection, it may take a few minutes to download. As shown in the picture below, the Download button can be found in the upper left-hand size of the screen underneath the browsing bar.
Please download each document/volume linked within to your PC before opening. Once document is download to your PC, the document can be read with ease.

Download Button