MSBA Submissions
Balmer Elementary School Feasibility Study
Preliminary Design Program (PDP) - October 6, 2017
Preferred Schematic Report (PSR) - January 3, 2018
Schematic Design Report (SD) - May 9, 2018
- Volume I Schematic Design Report
- Volume II Schematic Design Report
- Schematic Design Project Manual
- Schematic Design Drawings
- DESE Submission
Design Development Report (DD) - April 5, 2019
60% Construction Documents Submission - May 17, 2019
90% Construction Documents Submission - September 4, 2019
Please Note: The above files contained within this page range from 20MB to over 300MB in size.
Depending on the size of each document and the speed of your internet connection, it may take a few minutes to download. As shown in the picture below, the Download button can be found in the upper left-hand size of the screen underneath the browsing bar.
Please download each document/volume linked within to your PC before opening. Once document is download to your PC, the document can be read with ease.